Configure the facility and keep the ROI in view.

Beta release

This ROI calculator is currently in beta and may make mistakes. Please verify important numbers before relying on them.

Choose your industry

Trucks per day

/ day

Current plant TAT

hrs

Expected TAT after automation

Default: 25% reduction

hrs
18hr -> 13.5hr (25% reduction)

Cost per truck per hour

/ hr

Working days per year

days

Recoverable Idle Cost

Truck idle value

200 × 4.5hr × ₹900/hr × 330d = ₹2673.0L/yr

Theft & Pilferage

Material loss risk

200 × 330d × ₹5.0L × 0.10% = ₹330.0L/yr

Reconciliation Staff

Manual entry cost

2 staff × ₹25K/mo × 12 = ₹6.0L/yr

Theft rate

% material loss

%

Avg load value

per truck

Recon staff

data entry

Staff per WB

per shift

After TAT Guard: 2 staff

Salary per person

/ mo
12 operators × ₹25K/mo × 12 = ₹36.0L/yr

TAT Guard modules

Configure the delivery stack

Toggle modules on, then adjust the quantity where required.

Smart Queue (SQMS)

Gate Automation

AI Weighbridge

Loading & Dispatch

Queue Intelligence

1 Parking areas

Smart Queue (SQMS)

Reduces gate-to-gate wait by up to 40%

AI-powered queue prioritisation
Real-time yard density heatmap

Identity & Access

2 Gates

Gate Automation

3-layer identity verification with zero unauthorised entry

RFID and FASTag vehicle identification
ANPR licence plate recognition

Unmanned Weighment

2 Weighbridges

AI Weighbridge

Camera-only 45-second weighment with ERP sync

Camera-only architecture
AI weight stability validation

Dispatch Control

1 Loading points

Loading & Dispatch

End-to-end dispatch automation

Automated loading bay assignment
Bag counting integration